Find where your plant loses production.

    Track truck cycles, crusher feed and empty belt time together, so the shift you are reviewing shows where the material actually stopped moving.

    Ask about equipment compatibility, installation or pricing.

    Follow production from trucks to belts.

    See truck arrivals, crusher feed and belt activity together. Review events from a shift and decide what needs attention.

    Truck cycles

    Track arrivals, queues and tipping alongside crusher feed.

    Crusher feed

    Review feed activity and oversize events.

    Belt activity

    Measure black belt time, when a belt runs without material.

    Gradation

    Camera-based sizing, validated against your own sampling.

    Integration

    Assess PLC and rockbreaker integration for your equipment.

    We confirm camera coverage, detection capabilities and integration requirements for each site.

    Start with one area of your plant.

    Agree what to measure, then check camera positions, site connections and the equipment involved.

    Compare the record with the team's observations before expanding to another area.

    Talk to our team

    Ask about equipment compatibility, installation or pricing. Tell us the site and the area you want to look at, and we will reply by email.

    Prefer email? info@minoic.ai

    We reply to the email address you provide.

    Estimate additional annual production.

    Enter the productive time, sustained rate and operating days for one area of your plant.

    min/day

    Additional production time within the existing schedule.

    tons/h

    The rate the plant holds in normal running, not nameplate capacity.

    US short tons.

    days

    Days the plant is scheduled to run.

    Additional tons per year

    69,000

    An illustration based on your inputs. Actual output depends on plant capacity, operating conditions and demand.